North Rosamond Solar Project

The North Rosamond Solar Project was completed in June 2019 and generates enough energy to power about 71,000 homes. The power from the project is sold to Southern California Edison under a 15-year agreement. The facility’s design, procurement of PV modules, inverters, balance of plant systems and construction of the project were performed by First Solar Electric California’s engineering, procurement and construction (EPC) subsidiary under a fixed-price EPC agreement for the project. The project, which is located on approximately 1,188 acres outside of Rosamond, Calif., contains over 477,000 solar panels.

Project Info

Kern County, California

Solar

150 MW

Enough to power about 71,000 homes

Similar Projects.

Pflugerville Solar Project

Location Travis County, Texas
Project Type Solar
Project Size 144 MW

Learn More

Rambler Solar Project

Location Tom Green County, Texas
Project Type Solar
Project Size 200 MW

Learn More

Shirley Windpower

Location Brown County, Wisconsin
Project Type Wind

Learn More